10AT429-1 LONG LEAD – Klixon – Plunger Actuated Switch
USD 500.00 USD
Specifications
| Brand | Klixon |
| Type | Plunger Actuated |
| MPN | 10AT429-1 LONG LEAD |
What I appreciate about Klixon is the straightforward design philosophy.